1. Enterprise Integration, Management Information System
Research and the integrated information model for locomotive maintenance (1/05 – 12/06), supported by Ministration of Railway, China
Yu, M (PI), Chen, Y. (co-PI), Yang, C. L. (PostD.), Du, Z. Y. (master) , Li. X. L (master) , Bai, J. F. (master) , Wang, S. D. (master)
The main purpose of the project is to carry out an investigation on the product-service-chain of China and make a research on how to transform from traditional industry to service-oriented industry in China.
Services Oriented Value Networks (1/06 – 12/06), supported by IBM
Qiu, G. H. R (PI), Yu, M. (co-PI), Wang, F. (master) , Du Z. Y. (master)
The objective of this project is to create a platform to showcase services-oriented value networks
established using IBM WebSphere Business Integration (WBI) technology.
Services Oriented Value Networks (1/06 – 12/06), supported by IBM
Qiu, G. H. R (PI), Yu, M. (co-PI), Wang, F. (master) , Du Z. Y. (master)
The objective of this project is to create a platform to showcase services-oriented value networks
established using IBM WebSphere Business Integration (WBI) technology.
R&D of an integrated system of ERP and MES for a hydraulic equipment manufacturing company (9/01 – 6/03), supported by QC Ltd.
Yu, M. (PI), Wang, C. (master) , Zhang, B. (master) , Liu, Y. K. (master) Chen, R. X (master) , Su, Y. (Ph.D.) ,
This project developed an production management information system including the core function of PDM, ERP and MES, and be used in the real productoin.
2. System Engineering and Evaluation, Project Management, Technology Management
Research on the development model of Chinese technique-product-service-chain-No.70541007 (1/06 – 12/06), supported by NSF, China
Yu, M (PI), Qiu, G. H. R (co-PI), Yang, C. L. (PostD.), Chen, W (PhD)
The main purpose of the project is to carry out an investigation on the product-service-chain of China and make a research on how to transform from traditional industry to service-oriented industry in China.
Study on engineering methods for industrial solution businesses in China (12/05-9/06), supported by Siemens, CT E5
Yu, M (PI), Dr. Ulrich Lowen (co-PI), Zheng, L. (co-PI.), Yang, C. L. (PostD.), Huang Z. X. (master), Wei, W. (master)
This study is about the model of engineering project management in China, including the organization, methods and tools used in the process. The final target is to analysis the difference between China and Germany in the field of engineering project management.
Research on the enterprise performance measurement system based on work flow (9/02 – 9/04), supported by China National High-Tech R&D Program (863)
Yu, M. (PI), Li, R. W. (co-PI) Chen, Y. (Prof.) , Luo, M. (master), Zhou, Y. (master), Zheng, J. (master), Su, Y. (PhD), etc.
Based on the theory of work flow and process management, this project try to model the performance measuring system from data and process view. The research work involving the modeling of enterprise in term of performance and developing of evaluating system prototype to demo the process.
Research and development of a technique investment decision-support system for Beijing Science and Technology Bourael ?? (1/05 – 12/06), supported by Beijing Science and Technology Bourael ??
Yu, M (PI), Teng, R. J. (co-PI), Yang, J. (Prof.), Ma, D. H. (Engineer), Rau, P. R. P (Prof.), Yang, C. L.(PostD.), Yang, C. Y. (master), Yu, J. (Master), Wang, H. (Master), Wang, Lin (master).
This project aims at building a network platform to assistant the collaboration among experts and officers during the selection process for techniques to be supported.